Large span double-row steel sheet piles were constructed in marine environments to serve as cofferdams of dry dock projects. Due to the construction of the dock excavation, considerable deformation of the cofferdam could occur. The deformation of the large span double-row steel sheet piles was measured during construction of a large scale dock project in Shanghai. Extensive field performance data were collected including lateral survey data and lateral inclinometer data. Construction procedures were summarized and correlated with monitoring data. The measured data were analyzed to investigate the deformation performance of the large span double-row steel sheet piles. A 2D finite-element method was also performed to study the effect of the soil reinforcement technology on deformation control of the double-row steel sheet piles.
[1] | Wissmann K.Sheet pile tensions in cellular structures[J]. Journal of Geotechnical and Geoenviromental Engineering, 2003, 129(3): 224-233. |
[2] | Stuart D M. Project-specific steel sheet piling applications[J]. Practice Periodical on Structural Design and Construction, 2004, 9(4): 194-201. |
[3] | Crawford R J.A numerical model for predicting the bending strength of Larssen steel sheet piles[J]. Journal of Constructional Steel Research, 2002, 58(10): 1361-1374. |
[4] | Ou C Y, Liao J T, Lin H D.Performance of diaphragm wall constructed using top-down method[J]. Journal of Geotechnical and Geoenvironmental Engineering, 1998, 124(9): 798-808. |
[5] | Kim J M, Richard R P.Three-dimensional finite element modelling for consolidation due to groundwater withdrawal in a desaturating anisotropic aquifer system[J]. International Journal for Numerical and Analytical Methods in Geomechanics, 1999, 23(6): 549-571. |
[6] | 王清, 郭惟嘉, 刘正兴.修正剑桥模型在基坑开挖分析中的应用[J]. 上海交通大学学报, 2001, 35(4): 565-569. |
[6] | WANG Qing, GUO Wei-jia, LIU Zheng-xing. Application of modified cambridge model in foundation excavation[J]. Journal of Shanghai Jiaotong University, 2001, 35(4):565-569. |
/
〈 |
|
〉 |