[1]王嘉民,何琪敏,李晓鸣. 边装边卸流程的系统开发[J]. 港口装卸,2006(3):14.WANG Jiamin, HE Qimin, LI Xiaoming. System developm ent for dua l cyc le both loading and unloading process [J]. Port Operation, 2006(3):14.[2]包起帆, 罗文斌. 现代集装箱码头的建设与运营技术[M]. 上海:上海科学技术出版社.2006.[3]刘琴, 周强, 张艳伟. 同贝同步装卸的集装箱码头装卸工艺与堆场平面布置[J]. 水运工程, 2011(6): 6669.LIU Qin, ZHOU Qiang, ZHANG Yanwei. On synchronous loading and unloading technology within a bay and yard layout of container terminal [J]. Port &Waterway Engineering, 2011(6): 6669.[4]张煜, 匡家喜, 李文峰, 等. 非标准HFSB 问题的设备协同调度研究[J]. 武汉理工大学学报:交通科学与工程版, 2012, 36(2):239242.Zhang Yu, Kuang Jiaxin, Li Wenfeng, et al. Equipment coscheduling of nonbasic HFSB problem[J]. Journal of Wuhan University of Technology: Transportation Science& Engineering, 2012, 36(2):239242.[5]王艳, 王永奎. 推行边装边卸工艺,提高能源利用率[J]. 资源节约与环保, 2012(2):4850.[6]Goodchild A V, Daganzo C F. Crane double cycling in container ports: Planning methods and evaluation [J].Transportation Research Part B, 2007, 41(8):875891.[7]Goodchild A V, Daganzo C F. Double cycling strategies for container ships and their effect on ship loading and unloading operations [J]. Transportation Science, 2006, 40(4):473483.[8]Zhang Haiping, Kim K H. Maximizing the number of dualcycle operations of quay cranes in container terminals[J]. Computers & Industrial Engineering, 2009, 56(3): 979992.[9]曾庆成,杨忠振,陆婧. 集装箱码头同贝同步装卸调度模型与算法[J]. 交通运输工程学报, 2010,10(1): 8893. ZENG Qingcheng, YANG Zhongzhen, LU Jing. Scheduling model and algorithm of integrating loading and unloading operations in same shipbay at container terminal [J]. Journal of Traffic and Transportation Engineering, 2010,10(1): 8893.[10]TavakoliMoghaddam R, Makui A, Salahi S, et al. An efficient algorithm for solving a new mathematical model for a quay crane scheduling problem in container ports[J]. Computers & Industrial Engineering, 2009, 56 (1): 241248.[11]Nishimura E, Imai A, Papadimitriou S. Yard trailer routing at a maritime container terminal'[J]. Transportation Research Part E, 2005, 41(1): 5376.[12]Li Wenkai, Wu Yong, Petering M E H, et al. Robert de Souza. Discrete time model and algorithms for container yard crane scheduling [J]. European Journal of Operational Research, 2009, 198 (1): 165172.[13]KANG Haigui, ZHOU Pengfei. Research on programming of cranevehicle scheduling for loading containership [J]. Journal of Dalian University of Technology, 2006, 46 (3): 372379.[14]Chen Lu, Bostel N, Dejax P, et al. A tabu search algorithm for the integrated scheduling problem of container handling systems in a maritime terminal[J]. European Journal of Operational Research, 2007, 181(1): 4058.[15]Zeng Qingcheng, Yang Zhongzhen. Integrating simulation and optimization to schedule loading operations in container terminals[J]. Computers & Operations Research, 2009, 36(6):19351944.[16]Ribas I, Leisten R, Framian J M. Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective[J]. Computers & Operations Research, 2010, 37(8): 14391454. |