[1]中国工程院“21世纪中国可持续发展水资源战略研究”项目组. 中国可持续发展水资源战略研究综合报告[J]. 中国工程科学, 2000, 2(8): 117.Project Group of “Strategic Research on Sustainable Development of Water Resource in China in 21st Century”. Chinese academy of engineering. strategic research on sustainable development of water resource in China[J]. Engineering Science, 2000, 2(8): 117.[2]Idowu O A, Awomeso J A, Martins O. An evaluation of demand for and supply of potable water in an urban centre of abeokuta and environs, southwestern Nigeria[J]. Water Resources Management, 2012, 26(7): 21092121.[3]Sigel K, Altantuul K, Basandorj D. Household needs and demand for improved water supply and sanitation in periurban ger areas: The case of Darkhan, Mongolia[J]. Environmental Earth Sciences, 2012, 65(5): 15611566.[4]Schott K, Wilson S, Walkom S. Urban water reform: An industry perspective[J]. The Australian Economic Review, 2008, 41(4): 413419.[5]Donkor E A, Mazzuchi T A, Soyer R, et al. Urban water demand forecasting: Review of methods and models[J]. Journal of Water Resources Planning and Management, 2014, 140(2): 146159.[6]Marchetti C, Meyer P S, Ausubel J H. Human population dynamics revisited with the logistic model: How much can be modeled and predicted?[J]. Technological Forecasting and Social Change, 1996, 52(1): 130.[7]李可柏. 基于动态分摊系数法的城镇供水投资控制仿真模型[J]. 系统工程理论与实践, 2011, 31(1): 158164.LI Kebai. Town water supply investment control and simulation model based on dynamic share coefficient method[J]. Systems Engineering Theory & Practice, 2011, 31(1): 158164.[8]Moon W S. Endogenous labor force participation and firing costs[J]. Labour Economics, 2011, 18(5): 607623.[9]Falugi P, Kerrigan E, Wyk E V. Imperial college london optimal control software user guide (ICLOCS)[R]. London: Imperial College London, 2010. |