[1]Gupta J N D. Twostage hybrid flowshop scheduling problem [J]. Journal of the Operational Research Society, 1988, 39(4): 359364. [2]Kashan A H, Karimi B. An improved mixed integer linear formulation and lower bounds for minimizing makespan on a flow shop with batch processing machines [J]. International Journal Advanced Manufacturing Technology, 2009, 40(56): 582594. [3]Fu Q, Sivakumar A I, Li K. Optimisation of flowshop scheduling with batch processor and limited buffer [J]. International Journal of Production Research, 2012, 50(8): 22672285. [4]Kim Y D, Joo B J, Shin J H. Heuristics for a twostage hybrid flowshop scheduling problem with ready times and a productmix ratio constraint [J]. Journal of Heuristics, 2009, 15(1): 1942. [5]Bellanger A, Oulamara A. Scheduling hybrid flowshop with parallel batching machines and compatibilities [J]. Computer & Operations Research, 2009, 36(6): 19821992. [6]Luo H, Huang G Q, Zhang Y F, et al. Hybrid flowshop scheduling with batchdiscrete processors and machine maintenance in time windows [J]. International Journal of Production Research, 2011, 49(6): 15751603. [7]Sun J, Xu W, Feng B.A global search strategy of quantumbehaved particle swarm optimization [C]∥Proceedings of the 2004 IEEE Conference on Cybernetics and Intelligent Systems. Singapore: IEEE, 2004: 111116. [8]Sun C, Lu S. Shortterm combined economic emission hydrothermal scheduling using improved quantumbehaved particle swarm optimization [J]. Expert Systems with Applications, 2010, 37(6): 42324341. [9]Liu J, Sun J, Xu W. Improving quantumbehaved particle swarm optimization by simulated annealing [C]∥Proceedings of the 2006 International Conference on Computational Intelligence and Bioinformatics. Heidelberg, Germany: Springer Berlin Heidelberg, 2006: 130136. [10]Lin T L, Horng S J, Kao T W, et al. An efficient jobshop scheduling algorithm based on particle swarm optimization [J]. Expert Systems with Applications, 2010, 37 (3): 26292636. [11]Liu B, Wang L, Jin Y H. An effective PSObased memetic algorithm for flow shop scheduling [J]. IEEE Transactions on Systems, Man, CyberneticsPart B: Cybernetics, 2007, 37(1): 1827. [12]尹兆涛, 李铁克. 考虑交货期和等待时间受限的HFS调度问题的混合算法[J]. 工业工程, 2009, 12(1): 7983. YIN Zhaotao, LI Tieke. Hybrid algorithms for hybrid flowshop scheduling considering due dates and limited waiting times [J]. Industrial Engineering Journal, 2009, 12(1): 7983. [13]Pant M, Thangaraj R, Abraham A. A new quantum behaved particle swarm optimization [C]∥Proceedings of the 10th annual conference on Genetic and evolutionary computation. New York, NY, USA: ACM, 2008: 8794. |