[1]Thierry P, Stieltjes L, Kouokam E, et al. Multihazard risk mapping and assessment on an active volcano: The GRINP project at Mount Cameroon[J]. Natural Hazards, 2008, 45(3): 429456. [2]Winkler J, DuenasOsorio L, Stein R, et al. Interface network models for complex urban infrastructure systems[J]. Journal of Infrastructure Systems, 2011, 17(4): 138150. [3]Anastasia E, Athanasios K. Seismic vulnerability assessment of buildings based on damage data after a near field earthquake[J]. Earthquake and Structures, 2012, 3(2): 117140. [4]Biass S, Frischknecht C, Bonadonna C. A fast GISbased risk assessment for tephra fallout: The example of Cotopaxi volcano, EcuadorPart II: Vulnerability and risk assessment[J]. Natural Hazards, 2012, 64(1): 615639. [5]Arnous M O, Green D R. GIS and remote sensing as tools for conducting geohazards risk assessment along Gulf of Aqaba coastal zone, Egypt [J]. Journal of Coastal Conservation, 2011, 15(4): 457475. [6]Jackson C, Mosleh A. Bayesian inference with overlapping data: Methodology for reliability estimation of multistate ondemand systems[J]. Proceedings of the Institution of Mechanical Engineers, Part O: Journal of Risk and Reliability, 2012, 226(3): 283294. [7]Elmore P, Fabre D, Sawyer R, et al. Uncertainty estimation for databased bathymetry using a Bayesian network approach[J]. Geochemistry, Geophysics, Geosystems, 2012, 13(9): 111. [8]Jensen F V, Nielsen T D. Bayesian networks and decision graphs [M]. 2nd ed. New York: Springer Science Business Media, 2007: 1011. [9]Bertero B. Earthquake engineeringfrom engineering seismology to performancebased engineering[J]. Earthquake Spectra, 2005, 21(2): 609611. |